Difference between revisions of "Manuals/calci/DAYS360"
Jump to navigation
Jump to search
Line 20: | Line 20: | ||
==See Also== | ==See Also== | ||
− | |||
*[[Manuals/calci/DATE | DATE]] | *[[Manuals/calci/DATE | DATE]] | ||
*[[Manuals/calci/DAYS | DAYS]] | *[[Manuals/calci/DAYS | DAYS]] | ||
− | |||
==References== | ==References== |
Revision as of 22:45, 11 December 2013
DAYS360(sd,ed,lv)
- is the starting date
- is the end date
- is the logical value like true or false
Description
- This function gives the number of days between given dates based on 360 day year (30 days in 12 months).
- Here and are the two dates to find the in between days.
- is the logical value like TRUE or FALSE.
- When logical value is true, then the result is based on U.S.method.
- when logical value is false, then the result is based on the European method .
- when we are not giving any logical values it will consider the U.S method.
- This function will give result as NAN, when the end date is before the starting date.
Examples
- DAYS360("12/13/2013","1/13/2014",TRUE)=30
- DAYS360("2/20/2013","3/3/2013",FALSE)= 13