Difference between revisions of "Manuals/calci/DAYSBETWEEN"
Jump to navigation
Jump to search
Line 26: | Line 26: | ||
==References== | ==References== | ||
− | *[http://en.wikipedia.org/wiki/360-day_calendar | 360DAYS] | + | *[http://en.wikipedia.org/wiki/360-day_calendar| 360DAYS] |
Revision as of 03:28, 18 April 2014
DAYSBETWEEN(firstdate,seconddate)
- is the starting date.
- is the end date.
Description
- This function gives the number of days between the first date and the second date(30 days in 12 months).
- Here and are two dates to find the number of in between days.
- Also and we have to give in DATE function format.
- This function will give the result as error when the is before the .
ZOS Section
- The syntax is to calculate DAYSBETWEEN in ZOS is .
- is the starting date.
- is the end date.
- For e.g.,DAYSBETWEEN("2/1/1999","3/2/2005") = 2222.
Examples
- DAYSBETWEEN("2/28/2008","3/13/2008")=15
- DAYSBETWEEN("1-Sep-2014","1-Sep-2015")=366