Difference between revisions of "Manuals/calci/DAYSBETWEENBASIS"

From ZCubes Wiki
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
=DAYSBETWEENBASIS(SD, ED, basis)=
+
<div style="font-size:30px">'''DAYSBETWEENBASIS (From,To,Basis)'''</div><br/>
 
 
 
where  
 
where  
*<math>SD</math> represents a start date,
+
*<math>From</math> represents a start date,
*<math>ED</math> represents an end date, and
+
*<math>To</math> represents an end date, and
*<math>basis</math> is the type of day count basis to use.
+
*<math>Basis</math> is the type of day count basis to use.
 
+
**DAYSBETWEENBASIS() calculates the number of days between start date and end date with respect to the count basis factor.
DAYSBETWEENBASIS() calculates the number of days between start date and end date with respect to the count basis factor.
 
  
 
== Description ==
 
== Description ==
  
DAYSBETWEENBASIS(SD, ED, basis)
+
DAYSBETWEENBASIS (From,To,Basis)
  
 
*DAYSBETWEENBASIS() returns the number of days from specified start date to end date.
 
*DAYSBETWEENBASIS() returns the number of days from specified start date to end date.
*<math>SD</math> and <math>ED</math> dates should be entered either in 'date format' or 'dates returned using formulas'. If dates are not valid, Calci displays #N/A error message.
+
*<math>From</math> and <math>To</math> dates should be entered either in 'date format' or 'dates returned using formulas'. If dates are not valid, Calci displays #N/A error message.
*<math>SD</math> date should be &lt; <math>ED</math>, else Calci displays NaN error message.
+
*<math>From</math> date should be &lt; <math>To</math>, else Calci displays NaN error message.
*<math>basis</math> value is optional. If omitted, Calci assumes it to be 0.  
+
*<math>Basis</math> value is optional. If omitted, Calci assumes it to be 0.  
Below table shows the use of <math>basis</math> values:
+
*We can use the DD/MM/YYYY format also. For Example:"14/5/2005[DD/MM/YYYY]".
 +
 
 +
Below table shows the use of <math>Basis</math> values:
  
 
{| class="wikitable"
 
{| class="wikitable"
Line 33: Line 33:
 
|}
 
|}
  
*If <math>basis</math> value is other than 0 to 4, Calci displays #N/A error message.
+
*If <math>Basis</math> value is other than 0 to 4, Calci displays #N/A error message.
 +
*We can use Range values also. For Example: DAYSBETWEENBASIS(#1/1/2014-2/1/2014,"4/1/2014").
 +
* #date notation needs  mm/dd/yy format .
  
 
== Examples ==
 
== Examples ==
  
DAYSBETWEENBASIS(SD, ED, basis) function with inputs in order is calculated as follows:
+
DAYSBETWEENBASIS (From,To,Basis) function with inputs in order is calculated as follows:
  
 
<div id="2SpaceContent" class="zcontent" align="left">
 
<div id="2SpaceContent" class="zcontent" align="left">
Line 59: Line 61:
 
  =DAYSBETWEENBASIS(DATE(2014,1,1),DATE(2014,4,1)) : Calculates the days between the dates mentioned. <br/>Returns '''90''' as a result.
 
  =DAYSBETWEENBASIS(DATE(2014,1,1),DATE(2014,4,1)) : Calculates the days between the dates mentioned. <br/>Returns '''90''' as a result.
 
  =DAYSBETWEENBASIS(DATE(2014,1,1),DATE(2015,4,1)) : Calculates the days between the dates mentioned. <br/>Returns '''450''' as a result.
 
  =DAYSBETWEENBASIS(DATE(2014,1,1),DATE(2015,4,1)) : Calculates the days between the dates mentioned. <br/>Returns '''450''' as a result.
 +
=DAYSBETWEENBASIS("17/6/2004[DD/MM/YYYY]","21/5/2006[DD/MM/YYYY]")= 694
  
 
==Related Videos==
 
==Related Videos==

Latest revision as of 13:49, 22 August 2018

DAYSBETWEENBASIS (From,To,Basis)


where

  • represents a start date,
  • represents an end date, and
  • is the type of day count basis to use.
    • DAYSBETWEENBASIS() calculates the number of days between start date and end date with respect to the count basis factor.

Description

DAYSBETWEENBASIS (From,To,Basis)

  • DAYSBETWEENBASIS() returns the number of days from specified start date to end date.
  • and dates should be entered either in 'date format' or 'dates returned using formulas'. If dates are not valid, Calci displays #N/A error message.
  • date should be < , else Calci displays NaN error message.
  • value is optional. If omitted, Calci assumes it to be 0.
  • We can use the DD/MM/YYYY format also. For Example:"14/5/2005[DD/MM/YYYY]".

Below table shows the use of values:

Basis Description
0 US (NASD) 30/360
1 Actual/actual
2 Actual/360
3 Actual/365
4 European 30/360
  • If value is other than 0 to 4, Calci displays #N/A error message.
  • We can use Range values also. For Example: DAYSBETWEENBASIS(#1/1/2014-2/1/2014,"4/1/2014").
  • #date notation needs mm/dd/yy format .

Examples

DAYSBETWEENBASIS (From,To,Basis) function with inputs in order is calculated as follows:

1/4/2008
10/10/2008
4
=DAYSBETWEENBASIS(A1,A2,A3) : Calculates the days between the dates mentioned with the inputs 
in the range A1 to A3 with basis count factor '4'. Returns 276 as a result. =DAYSBETWEENBASIS(DATE(2014,1,1),DATE(2014,4,1)) : Calculates the days between the dates mentioned.
Returns 90 as a result. =DAYSBETWEENBASIS(DATE(2014,1,1),DATE(2015,4,1)) : Calculates the days between the dates mentioned.
Returns 450 as a result. =DAYSBETWEENBASIS("17/6/2004[DD/MM/YYYY]","21/5/2006[DD/MM/YYYY]")= 694

Related Videos

YEARFRAC

See Also

References