Difference between revisions of "Manuals/calci/cumprinc"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | <div style="font-size:30px">'''CUMPRINC(R, | + | <div style="font-size:30px">'''CUMPRINC(R,PP,PV,SP,EP,Type)'''</div><br/> |
*<math>R</math> is the interest rate. | *<math>R</math> is the interest rate. | ||
− | *<math> | + | *<math>PP</math> is the total number of payment periods. |
*<math>PV</math> is the present value. | *<math>PV</math> is the present value. | ||
− | *<math>SP</math> is | + | *<math>SP</math> is the Start period beginning with 1. |
− | *<math>EP</math> is | + | *<math>EP</math> is the End period. |
*<math>Type</math> is the timing of the payment. | *<math>Type</math> is the timing of the payment. | ||
Revision as of 05:00, 24 February 2014
CUMPRINC(R,PP,PV,SP,EP,Type)
- is the interest rate.
- is the total number of payment periods.
- is the present value.
- is the Start period beginning with 1.
- is the End period.
- is the timing of the payment.
Description
- This function gives the cumulative interest paid on a loan between and .
- CUMIPMT shows the ERROR value when
1. Interest Rate 2. Payment Periods 3. Present Value 4. Start PeriodFailed to parse (unknown function "\lt"): {\displaystyle (SP)\lt 1} 5. End PeriodFailed to parse (unknown function "\lt"): {\displaystyle (EP)\lt 1} 6. Failed to parse (MathML with SVG or PNG fallback (recommended for modern browsers and accessibility tools): Invalid response ("Math extension cannot connect to Restbase.") from server "https://wikimedia.org/api/rest_v1/":): {\displaystyle SP \gt EP}
- should be 0 or 1.
TYPE TIMIING 0 Payment at the end of the period 1 Payment at the beginning of the period
Examples
=CUMPRINC(0.03/12,B3*12,B4,13,24,0)
CUMPRINC returns -11046.6464.
Consider another example
=CUMPRINC(0.02/12,10*12,200000,10,20,1)
CUMPRINC returns -16939.2946.