Difference between revisions of "Manuals/calci/cumipmt"

From ZCubes Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
<div style="font-size:30px">'''CUMIPMT(R, NPPeriods, PValue, SP, EP, Type)'''</div><br/>
 
<div style="font-size:30px">'''CUMIPMT(R, NPPeriods, PValue, SP, EP, Type)'''</div><br/>
 
*<math>R</math> is the interest rate.
 
*<math>R</math> is the interest rate.
*<math>NPPeriods</math> is the total number of payment periods.
+
*<math>PP</math> is the total number of payment periods.
 
*<math>PV</math> is the present value.
 
*<math>PV</math> is the present value.
*<math>SP</math> is the first period beginning with 1.
+
*<math>SP</math> is the Start period beginning with 1.
*<math>EP</math> is the last period.
+
*<math>EP</math> is the End period.
 
*<math>Type</math> is the timing of the payment.
 
*<math>Type</math> is the timing of the payment.
  
Line 10: Line 10:
 
*This function gives the cumulative interest paid on a loan between <math>SP</math> and <math>EP</math>.
 
*This function gives the cumulative interest paid on a loan between <math>SP</math> and <math>EP</math>.
 
*CUMIPMT shows the ERROR value when
 
*CUMIPMT shows the ERROR value when
  1. <math>R\le 0</math>
+
  1. Interest Rate<math>(R)\le 0</math>
  2. <math>NPPeriods\le 0</math>
+
  2. Payment Periods <math>(PP)\le 0</math>
  3. <math>PresentValue\le 0</math>
+
  3. Present Value<math>(PV)\le 0</math>
  4. <math>P\lt 1</math>
+
  4. First Period<math>(SP)\lt 1</math>
  5. <math>EP\lt 1</math>
+
  5. End Period<math>EP\lt 1</math>
 
  6. <math>SP \gt EP</math>,
 
  6. <math>SP \gt EP</math>,
 
*<math>Type</math> should be 0 or 1.
 
*<math>Type</math> should be 0 or 1.

Revision as of 02:21, 24 February 2014

CUMIPMT(R, NPPeriods, PValue, SP, EP, Type)


  • is the interest rate.
  • is the total number of payment periods.
  •  is the present value.
  •  is the Start period beginning with 1.
  •  is the End period.
  •  is the timing of the payment.

Description

  • This function gives the cumulative interest paid on a loan between and .
  • CUMIPMT shows the ERROR value when
1. Interest Rate
2. Payment Periods 
3. Present Value
4. First PeriodFailed to parse (unknown function "\lt"): {\displaystyle (SP)\lt 1}

5. End PeriodFailed to parse (MathML with SVG or PNG fallback (recommended for modern browsers and accessibility tools): Invalid response ("Math extension cannot connect to Restbase.") from server "https://wikimedia.org/api/rest_v1/":): {\displaystyle EP\lt 1}

6. Failed to parse (unknown function "\gt"): {\displaystyle SP \gt EP}
,
  • should be 0 or 1.
TYPE             TIMIING
0                 Payment at the end of the period
1                 Payment at the beginning of the period

Examples

=CUMIPMT(0.03/12,B3*12,B4,13,24,0)

CUMIPMT returns -5527.3132.

Consider another example

=CUMIPMT(0.02/12,10*12,200000,10,20,1) CUMIPMT returns -3269.9831.

References