Manuals/calci/EDATE

Revision as of 20:34, 24 October 2013 by MassBot1 (talk | contribs) (Created page with "<div id="16SpaceContent" align="left"><div class="ZEditBox" align="justify"> Syntax </div></div> ---- <div id="2SpaceContent" align="left"><div class="ZEditBox" align=...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Syntax


Examples


'''''''  ''''

Description


EDATE 


 

EDATE(sd,M)

where sd  is a date that represents the start date and M is the number of months before or after start_date.


 It gives the serial number that represents the date that is the indicated number of months before or after a specified date (the start date). It is used to calculate maturity dates or due dates that fall on the same day of the month as the date of issue.

 Let's see an example in Column1Row1

I.e. C1R1 = 07/14/2007

I.e. =EDATE(C1R1,1) is Tue Aug 14 00:00:00 UTC+0530 2007(the date one month after the date above)

example2

///rly

=EDATE(C1R1,-1) is Thu Jun 14 00:00:00 UTC+0530 2007(the date one month before the date above)


Column1 Column2 Column3 Column4
Row1 07/14/2007 Tue Aug 14 00:00:00 UTC+0530 2007 Thu Jun 14 00:00:00 UTC+0530 2007
Row2
Row3
Row4
Row5
Row6