Difference between revisions of "Manuals/calci/DAYS360"

From ZCubes Wiki
Jump to navigation Jump to search
 
(5 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<div style="font-size:30px">'''DAYS360(sd,ed,lv)'''</div><br/>
+
<div style="font-size:30px">'''DAYS360(startdate,enddate,method)'''</div><br/>
 
+
*<math>startdate</math> is the date from which date counting have to start.
*<math>sd</math> is the starting date
+
*<math>enddate</math> is the ending date of the counting.
*<math>ed</math> is the end date
+
*<math>method</math> is the logical value either true or false.
*<math>lv</math> is the logical value like true or false
 
  
 
==Description==
 
==Description==
*This function gives the number of days between given dates based on 360 day year (30 days in 12 months).
+
*This function gives the number of days between given dates based on 360 days in a year. (30 days in 12 months).
*Here <math>sd</math> and <math>ed</math>are the two dates to find the in between days.
+
*Here <math>startdate</math> and <math>enddate</math>are the two dates to find the in between days.
*<math>lv</math> is the logical value like TRUE or FALSE.  
+
*<math>method</math> is the logical value like TRUE or FALSE.  
 
*When logical value is true, then the result  is based on U.S.method.
 
*When logical value is true, then the result  is based on U.S.method.
 
*when logical value is false, then the result is based on the European method .  
 
*when logical value is false, then the result is based on the European method .  
 
*when we are not giving any logical values it will consider the U.S method.  
 
*when we are not giving any logical values it will consider the U.S method.  
 
*This function will give result as NAN, when the end date is before the starting date.
 
*This function will give result as NAN, when the end date is before the starting date.
 +
 +
==ZOS==
 +
*The syntax is to calculate DAYS360 in ZOS is <math>DAYS360(startdate,enddate,method)</math>.
 +
*<math>startdate</math> is the date from which date counting have to start.
 +
*<math>enddate</math> is the ending date of the counting.
 +
*<math>method</math> is the logical value either true or false.
 +
*For e.g.,DAYS360("10/30/2010","6/15/2016",TRUE) = 2025.
 +
{{#ev:youtube|6MxgyrU7VB8|280|center|Days360}}
  
 
==Examples==
 
==Examples==
 
 
*DAYS360("12/13/2013","1/13/2014",TRUE)=30
 
*DAYS360("12/13/2013","1/13/2014",TRUE)=30
 
*DAYS360("2/20/2013","3/3/2013",FALSE)= 13
 
*DAYS360("2/20/2013","3/3/2013",FALSE)= 13
 +
 +
==Related Videos==
 +
 +
{{#ev:youtube|4CfTkI37jaM|280|center|DAYS360}}
  
 
==See Also==
 
==See Also==
 
*[[Manuals/calci/DATE  | DATE]]
 
*[[Manuals/calci/DATE  | DATE]]
*[[Manuals/calci/DAYS | DAYS]]
+
*[[Manuals/calci/DAY | DAY]]
  
 
==References==
 
==References==
 +
*[http://en.wikipedia.org/wiki/360-day_calendar| 360 DAYS]

Latest revision as of 11:56, 3 June 2015

DAYS360(startdate,enddate,method)


  • is the date from which date counting have to start.
  • is the ending date of the counting.
  • is the logical value either true or false.

Description

  • This function gives the number of days between given dates based on 360 days in a year. (30 days in 12 months).
  • Here and are the two dates to find the in between days.
  • is the logical value like TRUE or FALSE.
  • When logical value is true, then the result is based on U.S.method.
  • when logical value is false, then the result is based on the European method .
  • when we are not giving any logical values it will consider the U.S method.
  • This function will give result as NAN, when the end date is before the starting date.

ZOS

  • The syntax is to calculate DAYS360 in ZOS is .
  • is the date from which date counting have to start.
  • is the ending date of the counting.
  • is the logical value either true or false.
  • For e.g.,DAYS360("10/30/2010","6/15/2016",TRUE) = 2025.
Days360

Examples

  • DAYS360("12/13/2013","1/13/2014",TRUE)=30
  • DAYS360("2/20/2013","3/3/2013",FALSE)= 13

Related Videos

DAYS360

See Also

References