Difference between revisions of "Manuals/calci/VDB"

From ZCubes Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
*'L' is the number of periods over which the asset is depreciated
 
*'L' is the number of periods over which the asset is depreciated
 
*'SP' , 'EP' are the starting and ending periods to calculate the depreciation
 
*'SP' , 'EP' are the starting and ending periods to calculate the depreciation
*'factor' is the rate at which the balance declines
+
*'Factor' is the rate at which the balance declines
 
*'NSwitch' is a logical value specifying whether to switch to straight-line depreciation when depreciation is greater than the declining balance calculation.
 
*'NSwitch' is a logical value specifying whether to switch to straight-line depreciation when depreciation is greater than the declining balance calculation.
  
Line 26: Line 26:
 
|-
 
|-
 
! 2
 
! 2
| Salvage Value
+
| Salvage
 
| 350
 
| 350
 
|-
 
|-
 
! 3
 
! 3
|
+
| Number of Periods
 
| 12
 
| 12
 
|-
 
|-
 
! 4
 
! 4
|  
+
| Starting Period(SP)
 
| 0
 
| 0
 
|-
 
|-
 
! 5
 
! 5
|
+
| Ending Period(EP)
 
| 1
 
| 1
 
|}
 
|}

Revision as of 04:40, 27 February 2014

VDB(C, Salvage, L, SP, EP, Factor, NSwitch)

  • Where 'C' is the initial cost of the asset
  • 'Salvage' is the value at the end of the depreciation
  • 'L' is the number of periods over which the asset is depreciated
  • 'SP' , 'EP' are the starting and ending periods to calculate the depreciation
  • 'Factor' is the rate at which the balance declines
  • 'NSwitch' is a logical value specifying whether to switch to straight-line depreciation when depreciation is greater than the declining balance calculation.

Description

  • This function computes the depreciation of an asset for any period you specify, using the double-declining balance method.
  • To calculate depreciation, VDB uses a fixed rate.
  • When factor = 2 this is the double-declining-balance method (because it is double the straight-line rate that would depreciate the asset to zero).
  • The rate is given by:

Example

Spreadsheet
A B
1 Initial Cost(C) 3500
2 Salvage 350
3 Number of Periods 12
4 Starting Period(SP) 0
5 Ending Period(EP) 1

See Also

AMORDEGRC

References